The Airbus A310 is a wide-body airliner designed and manufactured by Airbus Industrie GIE, then a consortium of European aerospace manufacturers.

Airbus had identified a demand for an aircraft smaller than the A300, the first twin-jet wide-body. On 7 July 1978, the A310 (initially the A300B10) was launched with orders from Swissair and Lufthansa. On 3 April 1982, the first prototype conducted its maiden flight, and the A310 received its type certificate on 11 March 1983.

Keeping the same eight-abreast cross-section, the A310 is shorter than the initial A300 variants, has a smaller wing, down from , and a longer flying range up to . The A310 introduced a two-crew glass cockpit, later adopted for the A300-600 with a common type rating. It was powered by the same General Electric CF6-80 or Pratt & Whitney JT9D then PW4000 turbofan jet engines. It can seat 220 passengers in two classes, or 240 in all-economy. It has overwing exits between the two main front and rear door pairs.

In April 1983, the aircraft entered revenue service with Swissair, and competed with the Boeing 767-200, introduced six months before. Its longer range and ETOPS certification allowed it to be operated on transatlantic flights. It was also available as a cargo aircraft and in military variants: the A310 MRT (multi-role transport), which was further developed into the A310 MRTT (multi-role tanker transport). The aircraft was replaced by the larger Airbus A330-200. Production ended after 255 aircraft were produced, with the final A310 being delivered in June 1998.

Development Background

On 26 September 1967, the governments of France, West Germany and the United Kingdom signed a memorandum of understanding to commence the joint development of the 300-seat Airbus A300.Simons 2014, p. 38.Endres 2004, p. 43.Pitt and Norsworthy 2012, p. 57. The French and West Germans reached a firm agreement on 29 May 1969, after the British withdrew from the project on 10 April 1969. This collaborative effort between the two states resulted in the production of the consortium's first airliner, known as the Airbus A300. The A300 was a wide-body medium-to-long range passenger airliner; it holds the distinction of being the first twin-engine wide-body aircraft in the world.Senguttuvan 2006, p. 34.Pitt and Norsworthy 2012, pp. 57, 60. The design was relatively revolutionary for its time, and featured a number of industry firsts, making the first use of composite materials on a commercial aircraft; during 1977, the A300 became the first ETOPS-compliant aircraft, which was made possible due to its high performance and safety standards.Simons 2014, p. 40. The A300 would be produced in a range of models, and sold relatively well to airlines across the world, eventually reaching a total of 561 delivered aircraft during its production life.

During the development of the earlier A300, a range of different aircraft size and capacity were studied by the consortium; the resulting Airbus A300B proposal was one of the smaller options. When the A300B1 prototypes emerged, a number of airlines issued requests for an aircraft with greater capacity, which resulted in the initial production A300B2 version. As the A300 entered service, it became increasingly apparent that there was also a sizeable market for a smaller aircraft; some operators did not have enough traffic to justify the relatively large A300, while others wanted more frequency or lower aircraft-distance costs at the expense of higher seat-distance cost (specifically Swissair and Lufthansa). At the same time, there was great pressure for Airbus to validate itself beyond the design and manufacture of a single airliner. In response to these desires, Airbus explored the options for producing a smaller derivative of the A300B2.

Design effort

In order to minimise the associated research and development costs for the tentative project, Airbus chose to examine several early design studies performed during the A300 programme. The company ultimately chose to prioritise its focus on one option, which became known as the A300B10MC (standing for Minimum Change). As envisioned, the airliner's capacity was reduced to a maximum of 220 passengers, which was viewed at the time as being a desired capacity amongst many airlines. However, such a design would have resulted in a relatively small fuselage being mated to a comparatively large wing and oversized undercarriage; such an arrangement would have, amongst other things, made the aircraft consume an unnecessarily larger amount of fuel as it carried heavier weight than what was otherwise required.

Another problem for the programme was presented in the form of inflation, the rate of which in the United Kingdom (one of the early members of the Airbus consortium) was around 35 per cent during 1979–80. This factor was responsible for significantly raising the program's development costs and, as a knock-on effect, increase the per-unit cost of the resulting airliner.. During the development of the A300, British manufacturer Hawker Siddeley Aviation (HSA) had been appointed as the subcontractor to perform the manufacturing of the wing of the aircraft; shortly afterwards, the British government chose to withdraw from the newly formed venture during 1969. In 1977, HSA subsequently merged with three other British aircraft companies, resulting in the formation of British Aerospace (BAe). By this point in time, the British government had publicly indicated its intentions to rejoin the Airbus programme. In May 1976, the French government entered into a series of discussions on cooperation, during which its representatives stated that the placing of an order by British Airways (BA) was a condition for the re-admission of the United Kingdom into Airbus Industrie as a full partner.

However, both BA and Rolls-Royce had not relinquished their will to collaborate with the Americans in future aircraft endeavours and, in BA's case, procure American aircraft. During the late 1970s, BA sought to purchase two separate types of aircraft in development by American company Boeing, initially known as the 7N7 and 7X7, which would develop into the 757 and 767, the latter of which being an intended rival to the upcoming A310, as well as the existing Boeing 747. Independent of the British government, BAe commenced its own dialogue between itself and American aircraft manufacturers Boeing and McDonnell Douglas, for the purpose of assessing if BAe could participate in any of their future programmes, although the company's chairman, Lord Beswick, publicly stated that the overall aim of the firm was to pursue collaboration in Europe.. At the 1978 Farnborough Air Show, Eric Varley, the British Secretary of State for Industry, announced that BAe was to rejoin Airbus Industrie and participate as a full partner from 1 January 1979 onwards. Under the negotiated arrangement, BAe would be allocated a 20 per cent shareholding in Airbus Industrie, and would perform "a full part in the development and manufacturing of the A310".

From late 1977, prior to the Varley announcement, BAe had already commenced work on the design of the new wing at its facility in Hatfield. However, due to negotiations with Britain on its return to the Airbus consortium being protracted, alternative options were explored, including potentially manufacturing the wing elsewhere. At the same time as the British efforts, French aerospace firm Aérospatiale, German aircraft manufacturer Messerschmitt-Bölkow-Blohm (MBB), and Dutch-German joint venture company VFW-Fokker were also conducting their individual studies into possible options for the wing of the prospective airliner.

Programme launch

At the April 1978 Hannover Air Show, Airbus exhibited a model of the proposed A310. Its wing area, at was slightly larger than that studied, at ; its passenger cabin was twelve frames shorter than the A300, accommodating typical passenger loads of 195 in two-class, or 245 in all-economy. However, during the next twelve months, almost every aspect was further refined. On 9 June 1978, Swissair and Lufthansa developed a joint specification for the aircraft, and within a month, announced that they would place the launch orders. On 15 March, Swissair became the first airline to place a firm order for the type, announcing that it would acquire ten aircraft, with a further ten under option, to replace its McDonnell Douglas DC-9s on its major intra-European routes. Lufthansa was quick to place a $240 million ten-aircraft order; additional orders from French operator Air France and Spanish airline Iberia shortly followed.

Increasingly strong interest in the tentative airliner, coupled with the recovery of the industry during the late 1970s, contributed to Airbus deciding to put the A310 into production on 7 July 1978. During the latter half of 1978, an order for ten A300s was placed by independent British airline Laker Airways, satisfying Airbus's demand for the placing of a British order for their aircraft. On 1 April 1979, Lufthansa decided to raise its commitment for the type to 25 aircraft, along with 25 options. Two days later, Dutch operator KLM signed its order for ten aircraft and ten options at £238 million. On 6 July 1979, Air France announced that it had raised its order from four to thirty-five airliners. Other airlines announcing orders for the A310 during 1979 included Martinair, Sabena, and Air Afrique.Flight International 27 October 1979 edition.Airclaims Jet Programs 1995.

Initially, a pair of distinct versions of the A310 had been planned by Airbus; the regional A310-100, and the transcontinental A310-200. The A310-100 featured a range of with 200 passengers, whilst the A310-200 possessed a higher MTOW and centre section fuel, being able to carry the same load a further . Basic engines offered for the type included the General Electric CF6-45B2 and Pratt & Whitney JT9D-7R4. At one point, British engine manufacturer Rolls-Royce was openly considering offering an engine for the A310, the Rolls-Royce RB.207, however, it ultimately chose to discard such efforts in favour of a smaller three-spool design, the RB.211.

Entry into service The range of the A310 exceeds that of the A300 series, with the exception of the A300-600R, which in turn surpasses that of the A310-200. The greater range of the A310 contributed to the airliner being used extensively by operators on transatlantic routes. The A300 and A310 introduced the concept of commonality: A300-600 and A310 pilots can cross-qualify for the other aircraft with one day of training.

Sales of the A310 continued through the early 1980s. On 3 April 1982, the prototype A310-200 airliner conducted its maiden flight; by this point, the type had accumulated a combined orders and options for 181 aircraft, which had been placed by fifteen airlines worldwide, which was a better start than the original A300.A310 Certified Australian Transport June 1983 page 27 The launch customer of A310, Swissair, became the launch operator in April 1983. Over time, it had become clear that the longer-range series −200 aircraft was the more popular of the two models on offer. During 1979, in response to the lack of demand for the A310-100, Airbus decided to stop offering the lower gross weight model which had been originally proposed for Lufthansa; as a consequence, none of this variant were ultimately manufactured.

Sales and production end