The Central line is a London Underground line which runs between or in the west, and or Woodford via Hainault in the north-east, via the West End, the City, and the East End. Printed in red on the Tube map, the line serves 49 stations over , making it the network's longest line. It is one of only two lines on the Underground network to cross the Greater London boundary, the other being the Metropolitan line. One of London's deep-level railways traversing narrow tunnels, Central line trains are smaller than those on British main lines.
The line was opened as the Central London Railway in 1900, crossing central London on an east–west axis along the central shopping street of Oxford Street to the financial centre of the City of London. It was later extended to the western suburb of Ealing. In the 1930s, plans were created to expand the route into the new suburbs, taking over steam-hauled outer-suburban routes to the borders of London and beyond to the east. These projects were mostly realised after the Second World War, when construction stopped and the unused tunnels were used as air-raid shelters and factories. However, suburban growth was limited by the Metropolitan Green Belt: of the planned expansions one (to , Buckinghamshire) was cut short and the eastern terminus of ultimately closed in 1994 due to low patronage; part of this section between Epping and Ongar later became the Epping Ongar Railway. The Central line has mostly been operated by automatic train operation since a major refurbishment in the 1990s, although all trains still carry drivers. Many of its stations are of historic interest, from turn-of-the-century Central London Railway buildings in west London to post-war modernist designs on the West Ruislip and Hainault branches, as well as Victorian-era Eastern Counties Railway and Great Eastern Railway buildings east of , from when the line to Epping was a rural branch line.
In terms of total passengers, the Central line is the third busiest on the Underground. In 2019, over 300 million passenger journeys were recorded on the line. As of 2013, it operated the second-most frequent service on the network, with 34 trains per hour (tph) operating for half-an-hour in the westbound direction during the morning peak, and between 27 and 30 tph during the rest of the peak. The Elizabeth line, which began most of its core operation from 24 May 2022, provides interchanges with the Central line at Stratford, , , Ealing Broadway, and , relieving overcrowding.
History
Central London Railway
The Central London Railway (CLR) was given permission in 1891 for a tube line between Shepherd's Bush and a station at Cornhill, and the following year an extension to Liverpool Street was authorised, with a station at Bank instead of at Cornhill. The line was built following the streets above rather than running underneath buildings, because purchase of wayleave under private properties would have been expensive. While the tracks in opposite directions mostly run side-by-side, in some places one line runs above another due to lack of space, with platforms at different levels at St Paul's, Chancery Lane and Notting Hill Gate stations. The tunnels were bored with the nominal diameter of , increased on curves, reduced to near to stations. The tunnels generally rise approaching a station, to aid braking, and fall when leaving, to aid acceleration. The Central London Railway was the first underground railway to have the station platforms illuminated electrically. All the platforms were lit by Crompton automatic electric arc lamps, and other station areas by incandescent lamps. Both the City and South London Railway and the Waterloo and City Railway were lit by gas lamps, primarily because the power stations for these lines had been designed with no spare capacity to power electric lighting. With the white glazed tiling, all underground Central London Railway platforms were very brightly lit. The use of electric lighting was further made possible because the Central London was also the first tube railway to use AC electrical distribution and the substation transformers, not compatible with DC, were able to reduce the voltage to the level required for lighting. Earlier tube lines used DC power generators at the 500volts required to run the trains.
The line between Shepherd's Bush and Bank was formally opened on 30 June 1900, public services beginning on 30 July. With a uniform fare of 2d the railway became known as the "Twopenny Tube". It was initially operated by electric locomotives, with motor armatures built directly on the axles to eliminate noise-producing gearboxes, hauling carriages. This did not allow springing, and the locomotives' considerable unsprung weight caused much vibration in the buildings above the line, so that the railway rebuilt the locomotives to use geared drives. This allowed higher-speed and lighter motors to be used, which reduced the unsprung, and total, weight of the locomotive. The railway also tried an alternative approach: it converted four coaches to accommodate motors and control gear. Two of these experimental motor coaches were used in a 6-coach train, the control gear being operated by the system used on the Waterloo and City Railway. The modified locomotives were a considerable improvement, but lighter purpose-designed motor coaches were even better. The CLR ordered 64 new motor cars designed to use Sprague's recently developed traction control system. The CLR was exclusively using the resulting electric multiple units by 1903.
In July 1907, the fare was increased to 3d for journeys of more than seven or eight stations. The line was extended westwards with a loop serving a single platform at Wood Lane for the 1908 Franco-British Exhibition. A reduced fare of 1d, for a journey of three or fewer stations, was introduced in 1909, and season tickets became available from 1911. The extension to Liverpool Street opened the following year, providing access to the Great Eastern Railway station and the adjacent Broad Street railway station by escalators. The Central London Railway was absorbed into the Underground Group on 1 January 1913.
In 1911, the Great Western Railway won permission for a line from Ealing Broadway to a station near to the CLR's Shepherd's Bush station, with a connection to the West London Railway, and agreement to connect the line to the Central London Railway, and for the CLR to run trains to Ealing Broadway. Construction of the extension from the CLR to Ealing Broadway started in 1912, but opening was delayed by World War I. The CLR purchased new rolling stock for the extension, which arrived in 1915 and was stored before being lent to the Bakerloo line. The rolling stock returned when the extension opened in 1920.
In 1912, plans were published for a railway from Shepherd's Bush to Turnham Green and Gunnersbury, allowing the Central London Railway to run trains on London and South Western Railway (L&SWR) tracks to Richmond. The route was authorised in 1913, but work had not begun by the outbreak of war the following year. In 1919, an alternative route was published, with a tunnelled link to the disused L&SWR tracks south of their Shepherd's Bush station then via Hammersmith (Grove Road) railway station. Authorisation was granted in 1920, but the connection was never built, and the L&SWR tracks were used by the Piccadilly line when it was extended west of Hammersmith in 1932.
London Transport and the Second World War On 1 July 1933, the Central London Railway and other transport companies in the London area were amalgamated to form the London Passenger Transport Board, generally known as London Transport. The railway was known as the "Central London Line", becoming the "Central line" in 1937. The 1935–40 New Works Programme included a major expansion of the line. To the west new tracks were to be built parallel with the Great Western Railway's New North Main Line as far as Denham. To the east, new tunnels would run to just beyond Stratford station, where the line would be extended over the London & North Eastern Railway suburban branch to Epping and Ongar in Essex, as well as a new underground line between Leytonstone and Newbury Park mostly under Eastern Avenue so as to serve the new suburbs of north Ilford and the Hainault Loop. Twenty two level crossings would also be removed, grade separating the line. Platforms at central London stations would also be lengthened to allow for 8-car trains.
Construction started, the tunnels through central London being expanded and realigned and the stations lengthened, but it proved impossible to modify Wood Lane station to take 8-car trains and a new station at White City was authorised in 1938. The line was converted to the London Underground four-rail electrification system in 1940. The positive outer rail is higher than on other lines, because even after reconstruction work the tunnels are slightly smaller. Most of the tunnels for the extensions to the east of London had been built by 1940, but work slowed due to the outbreak of the Second World War until eventually being suspended in June. The unused tunnels between Leytonstone and Newbury Park were equipped by the Plessey Company as an aircraft components factory, opening in March 1942 and employing 2,000 people. Elsewhere, people used underground stations as night shelters during air raids. The unopened Bethnal Green station had space for 10,000 people. In March 1943, 173 people died there in a crowd crush when a woman entering the shelter fell at the bottom of the steps and those following fell on top of her.
Post war
Construction restarted after the war, and the western extension opened as far as Greenford in 1947 and West Ruislip in 1948. The powers to extend the line to Denham were never used due to post-war establishment of the Green Belt around London, which restricted development of land in the area. The eastern extension opened as far as Stratford in December 1946, with trains continuing without passengers to reverse in the cutting south of Leyton. In 1947, the line opened to Leytonstone, and then Woodford and Newbury Park. Stations from Newbury Park to Woodford via Hainault and from Woodford to Loughton were served by tube trains from 1948. South of Newbury Park, the west-facing junction with the main line closed in the same year to allow expansion of Ilford carriage depot. The extension transferred to London Underground management in 1949, when Epping began to be served by Central line trains. The single line to Ongar was served by a steam autotrain operated by British Rail (BR) until 1957, when the line was electrified. BR trains accessed the line via a link from Temple Mills East to Leyton.
On 8 April 1953, 12 people were killed and 46 were injured as a result of a rear-end collision in a tunnel just to the east of Stratford station, caused by driver error after a signal failure.
The Central line stations east of Stratford kept their goods service for a time, being worked from Temple Mills, with the Hainault loop stations served via Woodford. The BR line south of Newbury Park closed in 1956 and Hainault loop stations lost their goods service in 1965, the rest of the stations on the line following in 1966. Early morning passenger trains from Stratford (Liverpool Street on Sundays) ran to Epping or Loughton until 1970. The single-track section from Epping to Ongar was electrified in 1957 and then operated as a shuttle service using short tube trains. However, carrying only 100 passengers a day and losing money, the section closed in 1994, and is now used by the heritage Epping Ongar Railway.